91青草久久久久久清纯_最新中文字幕av专区_皇上破了宫女的处h_周于希裸全身任何部位无遮挡

EN
The flue gas purification project of the Nankang household waste incineration power generation project in Ganzhou City, Jiangxi Province, undertaken by Huaxing Oriental, has passed 72+24 hour trial operation
2023.08.31
The flue gas cleaning (FGC) project undertaken by Huaxing-east for Nankang waste incineration power plant in Ganzhou, Jiangxi passed 72+24 hours trial operation on April 11, 2023.
The plant total capacity is 2000 t/d and will be constructed in 2 phases. The 1st (current) phase of the plant has a treatment capacity of 1000 t/d of municipal solid waste. Two 500 t/d incineration lines will be constructed, along with the installation of one condensing steam turbine generator with rated power 30 MW (expansion of 1000 t/d production line for 2nd phase reserved). The FGC process applied "In-furnace SNCR + semi-dry rotary spray + dry powder injection + activated carbon adsorption + bag filter + fly ash conveying, storage and stabilization". It is an EPC project of Huaxing.
Huaxing's achievements in Jiangxi Province include Jiujiang Duchang, Nanchang Hongcheng, Yichun, Nanchang Quanling, Yichun Fengcheng, Ganzhou Nankang, Longnan, Jingdezhen, etc.

For more information, please click or scan below!
Follow us!