91青草久久久久久清纯_最新中文字幕av专区_皇上破了宫女的处h_周于希裸全身任何部位无遮挡

EN
The FGC project undertaken by Huaxing East for Shunyi Beijing WTE Phase III started construction.
2022.08.11

The flue gas cleaning (FGC) project undertaken by Huaxing for Shunyi WTE Phase III in Beijing was commenced on May 9, 2021.



The plant will build 1x800 t/d grate furnance and 1x18 mw condensing steam turbine with an annual operation of 8000 hours. FGC applies SNCR with urea denitrification in furnace + spray dry reactor with Ca(OH)2 + activated carbon and dry deacidification agent injection system with Ca(OH)2 + bag filter+GGH+SGH + SCR reactor with urea + fly ash conveying, storage and stabilization process. This is an EPC project of Huaxing.



The achievements of Huaxing East in Beijing include Tongzhou Phase II, Shunyi Phase III, etc.