91青草久久久久久清纯_最新中文字幕av专区_皇上破了宫女的处h_周于希裸全身任何部位无遮挡

EN
The flue gas cleaning (FGC) upgradation and renovation project undertaken by Huaxing-east for Xianengxin waste incineration power plant in Jingxing, Shijiazhuang, has started construction.
2023.04.21
The FGC upgradation and renovation project undertaken by Huaxing-east for Xianengxin waste incineration power plant in Jingxing, Shijiazhuang, began construction on February 20, 2023.
The total plant processing capacity is 1200 t/d. 2x600 t/d mechanical grate incineration lines are constructed, equipped with 2x12 MW steam turbine units. The FGC adopted the process of "SNCR renovation + dry deacidification SDS + activated carbon injection (not contractor scope) + bag filter (not contractor scope) + SGH steam-gas-heater + low-temperature SCR + catalyst from Mitsubishi Heavy Industry". It is an EPC project of Huaxing.
The achievements of Huaxing East in Hebei Province include Baoding phase I & II, Hengshui, Anping, Dingzhou, Cangzhou phase I, Shijiazhuang, Caofeidian, Weichang, Shunping, Tangshan phase I & II, North Zhangjiakou, Gu'an, Xianghe, Luanzhou, Shahe, Xia Nenxin of Shijiazhuang, etc.
For more information, please click or scan below!
Follow us!