91青草久久久久久清纯_最新中文字幕av专区_皇上破了宫女的处h_周于希裸全身任何部位无遮挡

EN
The second phase of the flue gas cleaning project of the Zhangqiu domestic waste incineration power generation project in Jinan City, Shandong Province, contracted by Huaxing East Co., has commenced the construction phase
2023.09.26
The second phase flue gas cleaning project of the Zhangqiu Domestic Waste Incineration Power Generation Project in Jinan City, Shandong Province, undertaken by our company, started construction on August 1, 2022.
The total design scale of the project is to process 1,800 tons of domestic waste per day, and is equipped with 2×900t/d mechanical grate incinerator + 1×45MW medium-temperature sub-high-pressure condensing steam turbine generator set. The flue gas treatment adopts the flue gas cleaning process of "semi-dry method (rotary spray reaction tower absorber) + dry method (injection of calcium hydroxide) + activated carbon injection + BHF+ fly ash transportation and storage", which is our EPC project.
The achievements of Huaxing East Co. in Shandong include: Weifang Phase I, Phase II, Weifang Zhucheng, Weifang Gaomi, Weifang Changle, Yantai Muping, Tai'an, Zichuan, Zibo Lintong Phase I, Phase II, zibo Yiyuan, Linyi Phase II, Linyi Lanshan, Linyi Yishui Phase I, Phase II, Qingdao xiaoyuxi, Qingdao Huangdao, Qingdao Laixi, Dezhou, Dezhou lingcheng, Dezhou Linyi, Weihai Wendeng, Yantai Longkou, jinan Shanghe, Jinan Zhangqiu Phase II, Jinan Laiwu, Jining Yanzhou, Jining Yutai, Zaozhuang, Yantai Laizhou, Heze Dingtao, and many other projects.
For more information, please click or scan below!
Follow us!