The flue gas cleaning (FGC) project of solid waste incineration power generation in Chengde of Hebei Province, undertaken by Huaxing-East, has passed the 72-hour + 24-hour trial operation
2024.08.31
The flue gas cleaning (FGC) project of solid waste incineration power generation in Chengde of Hebei Province, undertaken by our company, has passed the 72-hour + 24-hour trial operation on April 16th, 2023.
The processing capability of this waste incinerator kit is 1×300t/d. The flue gas treatment includes "SNCR+ rotary spray semi-dry method + dry spraying method + activated carbon adsorption + bag dust collector +1#GGH + wet deacidification + 2#GGH + SGH + SCR+ Catalyst" + fly ash transportation, storage as well as steady processes, all of which are supplied by our equipments.
Huaxing East's projects achieved in Hebei Province include: Baoding Phase I & Phase II, Hengshui, Anping, Dingzhou, Cangzhou Phase I, Shijiazhuang, Caofeidian, Weichang, Shunping, Tangshan Phase I & Phase II, North Zhangjiakou, Gu 'an, Xianghe, Luanzhou, Sanhe, Shahe, Shijiazhuang Xiannengxin, Shijiazhuang Xingtang, Handan, Xingtai Wei County and other projects.