The flue gas cleaning (FGC) project of solid waste incineration power generation in Chengde of Hebei Province, undertaken by Huaxing-East, has passed the 72-hour + 24-hour trial operation
2024.08.31
The flue gas cleaning system upgrading project of household waste incineration power generation in downdown Yibin, Sichuan Province, undertaken by our company, has started construction since Sep 21st., 2023.
The design capacity of the project is 600 tons of household waste per day. There'll be two waste incineration treatment lines. The original flue gas treatment includes the treatment process of "SNCR+ semi-dry method + dry method + activated carbon spraying + bag material of dust collector". The upgrading flue gas cleaning processes "SGH+ low temperature SCR+ Catalyst" are supplied as our company's EPC project.
Huaxing-East's project achievements in Sichuan include: Guangyuan, Longfeng Pengzhou Chengdu, JinTang Chengdu, Dengshuang Chengdu, Xuanhan Dazhou, Zhongjiang Deyang, Ziyang, Bazhong, Zigong, Guang'an, Yibin, Luzhou and other projects.
Click to enter!
Take you to explore - Huaxing East

Professional equipment supplier and system integrator in the field of flue gas cleaning (FGC)